Projects

We are totally committed to manufacturing the highest quality parts for your project. Quality and Safety has been and continues to be the main focus of FMR.

Connectors used for “abandon and recovery operations” of subsea pipelines 5,000 pound weldment with finish machined bores - 5’ diameter x 2’ tall - 2” to 5” plate construction - Built and inspected to AWS D1.1 - Load Tested
Connectors used for “abandon and recovery operations” of subsea pipelines 5,000 pound weldment with finish machined bores
  • 5’ diameter x 2’ tall

  • 2” to 5” plate construction

  • Built and inspected to AWS D1.1

  • Load Tested

  •  
    18,500 pound rough forging x 65” O.D. - 7,000 pound finished weight - Machining included large spherical radius with critical finish requirements 16,000 pound weldment with finished machine bores and mounting surfaces - 14’ long x 6’ tall x 3’ wide - Built and inspected to AWS D1.1 and DNV-OS-E101
    Machining included large spherical radius with critical finish requirements
  • 18,500 pound rough forging x 65” O.D.
  • 7,000 pound finished weight
  • 16,000 pound weldment with finished machine bores and mounting surfaces
  • 14’ long x 6’ tall x 3’ wide
  • Built and inspected to AWS D1.1 and DNV-OS-E101

  •  
    Centralized Hydraulic Power Unit (CHPU) - Contained (4) 200 hp motors and pumps - 15’ wide x 17’ long x 12’ tall - Approx. 70,000 pounds finished weight B.O.P Body and Doors
    Centralized Hydraulic Power Unit (CHPU)
  • Contained (4) 200 hp motors and pumps
  • 15’ wide x 17’ long x 12’ tall
  • Approx. 70,000 pounds finished weight
  • B.O.P Body and Doors
     
    16,000 pound weldment Offshore B.O.P. Handling Equipment
    16,000 pound weldment built and inspected to AWS D1.1 and DNV – OS-E101 Offshore B.O.P. Handling Equipment